Generating Schedules to Maximize Quality

April 2004

Generating Schedules to Maximize Quality

Authors:

Xiaofang Wang and Stephen Smith
Technical Report
CMU-RI-TR-04-25

Abstract:

In this paper, we define a class of scheduling problems. In addition to the normal resource constrained project scheduling assumptions, each activity in a project has a quality profile with an anytime property, which means that it can be stopped at any time and the quality of the output is proportional to its duration. Instead of finishing all activities as fast as possible, the goal of scheduling is to maximize the sum of qualities given a hard project due date. We formulate this quality maximization problem, analyze its complexity and present a precedence constraint posting procedure for generating a schedule with a good quality sum. Different constraint posting heuristics are evaluated based on the solution they can produce and the number of posted constraints.
@techreport{Wang-2004-8896,
author = {Xiaofang Wang And Stephen Smith},
title = {Generating Schedules to Maximize Quality},
year = {2004},
month = {April},
institute = {Carnegie Mellon University},
address = {Pittsburgh, PA},
number = {CMU-RI-TR-04-25},
}
Copyright notice: This material is presented to ensure timely dissemination of scholarly and technical work. Copyright and all rights therein are retained by authors or by other copyright holders. All persons copying this information are expected to adhere to the terms and constraints invoked by each author's copyright. These works may not be reposted without the explicit permission of the copyright holder.